Add to Cart
Dongyang Hydraulic Rock Breaker Excavator Mounted Rock Drill Machine
Description
1. Powerful strike. A better design combining efficiency, reliability and durability.
2. Stable performance, improve reliability and durability
3. Low noise and vibration due to specially designed box-brackets and damper installed.
4. Simplified lubrication for reliability
5. Meet diversified technical requirements of customers
6. Newly-design casing, better appearance
7. Adopt High strengh material to get better wearing resistance.
Specification
Model | Unit | JSB200 | JSB300 | JSB400 | JSB600 | JSB800 | JSB900 | JSB1600 |
Weight | Kg | 200 | 270 | 330 | 450 | 680 | 1000 | 2000 |
Length | Mm | 1344 | 1420 | 1590 | 1895 | 2101 | 2401 | 2822 |
Pressure | Kg/m² | 80-110 | 90-120 | 110-140 | 120-150 | 130-160 | 150-170 | 160-180 |
Flow | L/Min | 20-30 | 25-50 | 40-70 | 50-90 | 60-100 | 80-110 | 100-150 |
Rate | Bpm | 600-1200 | 550-1000 | 500-900 | 400-800 | 400-800 | 350-700 | 350-600 |
Hose | Inch | 1/2 | 1/2 | 1/2 | 1/2 | 3/4 | 3/4 | 1 |
Chisel | Mm | 45 | 53 | 68/70 | 75 | 85 | 100 | 135 |
Suit | Ton | 0.8-3.0 | 1.0-3.5 | 4-7 | 6-9 | 7-14 | 11-16 | 16-21 |
Model | Unit | JSB1900 | JSB2800 | JSB3500 | JSB4500 | JSB5000 | JSB5500 | JSB6500 |
Weight | Kg | 2050 | 2800 | 3100 | 3950 | 4200 | 4900 | 7100 |
Length | Mm | 2828 | 3052 | 3254 | 3450 | 3709 | 3800 | 4430 |
Pressure | Kg/m² | 160-180 | 160-180 | 160-180 | 160-180 | 160-180 | 160-180 | 190-210 |
Flow | L/Min | 120-180 | 150-210 | 180-240 | 200-260 | 210-290 | 250-310 | 290-370 |
Rate | Bpm | 350-500 | 300-450 | 300-450 | 250-400 | 200-350 | 250-320 | 200-400 |
Hose | Inch | 1 | 1 | 1.25 | 1.25 | 1.25 | 1.25 | 1.25 |
Chisel | Mm | 140 | 150 | 155 | 165 | 175 | 180 | 210 |
Suit | Ton | 18-26 | 25-30 | 28-45 | 30-45 | 40-55 | 44-70 | 65-100 |
We also wholesale a full range of spare parts including chisel ,ring bush , back head and front head, cylinder, seal kits ,etc.
Application
1. Mining: Mountains, mining, crushing, secondary crushing
2. Metallurgy, slag cleaning, ladle furnace demolition, demolition equipment foundation body dissatisfied
3. Railway, tunnel, bridge, mountain down.
4. Highway: highway repair, cement pavement broken, foundation excavation.
5. Municipal gardens, concrete crushing, gas engineering construction, the transformation of the old city.
6. Building: the old building demolition, reinforced concrete broken.
Package
1. The standard free spare parts delivered with hydraulic breaker including: two pieces of Chisel, two pieces of high pressure oil hoses, a set of nitrogen charging device includes a gas bottle and a pressure gauge , a set of repair tools contained in tool box.
2. Inner is stretch film, outside is export wooden case or as customer’s request
Delivery
1. Delivery time: Usually 3-7days (1-5sets) after down payment.
2. We can arrange ocean or air transportation according to your request from any port of China.